Albuquerque Bernalillo County Water Authority

The 1.877 MW ground mounted system constructed for Albuquerque Bernalillo County Water Utility Authority (ABCWUA) is built on solar trackers from Array Technologies, also headquartered in Albuquerque, NM. The tracking system uses a GPS-based controller to increase electricity generation by the PV system to further increase energy savings for ABCWUA.

Albuquerque

Project Details

System Size

1.877 MW

Total Modules

5,776

Mounting

Ground Mounted Tracker

Year Installed

2017

Estimated Annual Production

Not Estimated Yet